top of page

Week 2: Taking Strides Towards the Finish Line

  • Writer: Najilah Jones
    Najilah Jones
  • May 28, 2018
  • 1 min read

The second week was full of renovation projects. We spent a lot of time going between IKEA, Home depot, and Lowe's. It seemed like every time we finished one trip, another item would be needed.

Before any trips were made, the walls were sanded, everything that was not going to be painted was taped and/or covered, and the floors were cleaned. Once that was completed we made trips to the various stores to buy paint supplies. After painting, we began the staging process. Everything that we bought from IKEA had to be assembled, which was one of my main jobs. I assembled cabinets, vanities, night stands, and totes. Beyond this, some of them had to be stained and/or painted before it was assembled.

The renovation is not yet completed, but it is almost done, and completed pictures will be posted in the near future.

 
 
 

Commentaires


Follow

  • Facebook
  • Twitter
  • LinkedIn

Contact

(435)862-6422

Address

351 W University Blvd
Cedar City, Iron County 84720
USA

©2017 by Najilah Jones Edge Project. Proudly created with Wix.com

bottom of page